Main Page
Doug's Page
Doug's Brew Page
RIMS Design w/o Hot Liquor Tank
J. Doug Brown
This design has not been tested. The following diagrams
are being provided for discussion purposes only. If you choose to
implement anything seen on this page, please send email describing how it was
implemented, how well this design worked, and any problems
encountered. Please also keep in mind that as of yet, I have not
actually brewed an all grain batch of beer. Take all information
presented here as coming from a beginning brewer.
This image is a conceptual design of the external plumbing on
this RIMS design. Note the heating assembly is not pictured.
A table is included describing the valve and pump statuses
during various stages in a RIMS operation. If problems, or
suggestions are found please send email describing them.
Storage Mode
This image depicts the system in the Storage and prior to Start
state.
Note: The water supply to the system is disconnected
during storage.
Initial Warm Water Fill
This image depicts the system during the initial filling
operation, ie. getting ready to float the grain bed over the false
bottom. During the external recirculation cycles the air removal
module is required. Without the module any air in the external
circulation system would run through the pump thoroughly aerating the
wort. The air removal module pumps wort into the top of a chamber
where air bubbles can vent out the top onto the grain bed. Wort
without air bubbles is drawn back to the pump without the presence of
bubbles.
Underletting of Grain Bed
If the grain bed ever compacts a mild pressure underlet can be
performed by this method. If a pressurized underlet is required
another valve could be added on the plumbing flowing down from the air
removal module to force all incoming water under the false bottom
without any pressure release venting through the air removal module.
Normal RIMS Operation
During normal RIMS operation no fluid is added so no external
recirculation mixing needs to be performed.
Mashout
During the mashout stage the wort is slowly drained from under the
false bottom directly to the boiling vessel. The wort volume is
replaced with heated water from the external recirculation of cold and
heated fluid pumped through the heating chamber being brought up to
mashout temperatures.
Pump Priming
Prior to pump operation it is recommended that the pump be primed
to avoid pump damage and aeration of the wort. Once water has filled
the Air Removal Chamber the pump may be started. This method caused
the Pump, and Heating Chamber to both be filled prior to usage.
Heated Fluid Fill
This process could be used to fill the RIMS vessel with heated
water during the start of the mashing sequence, or to add small
amounts of heated water to the RIMS system to account for grain
absorption of fluid.